Browse the store →EPRI guidelines for maintaining condenser cleanliness, optimizing heat rate, and preventing tube failures in fossil power generation.
In fossil power plants, the steam surface condenser is critical to overall cycle efficiency. Even slight fouling can result in significant heat rate deterioration and unit output losses [1].

Outages in 4 years
due to condenser tube failures [2]
Heat rate penalty
from 1mm scale [1]
of U.S. generating units
use online cleaning systems [3]
Annual fuel savings
from optimized cleaning [4]
The Electric Power Research Institute (EPRI) has developed comprehensive guidelines for the operation and maintenance of steam surface condensers, intended to assist plant engineers, operators, and maintenance personnel in improving availability and performance [5]. Tubeside cleanliness is crucial to condenser and heat exchanger performance, service life, and maintenance requirements.
Mineral scale is a primary contributor to condenser fouling. Unlike biofouling or sediment, scale chemically bonds to tube surfaces, requiring mechanical or chemical removal—and continuously reforms without preventive measures.
EPRI's "Recommended Practices for Operating and Maintaining Steam Surface Condensers" (EPRI-CS-5235) provides a comprehensive framework including [5]:
Fundamental principles of steam condensation, heat transfer, and the factors affecting condenser performance.
Identification of common issues including fouling, scaling, corrosion, air in-leakage, and tube failures.
Techniques for measuring cleanliness factor, heat transfer coefficient, and approach temperature.
Methods to protect condensers during outages, including scale prevention during idle periods.
Both online and offline cleaning techniques, including mechanical and chemical approaches.
Tube plugging, replacement, corrosion countermeasures, and corrosion monitoring.
Calcium carbonate, calcium sulfate, silica. Chemically bonded, requires mechanical or chemical removal.
Microbiological growth including slime, algae, and macrofouling organisms [6].
Silt, sand, and suspended solids settling in low-flow areas.
Iron oxide, copper oxide deposits from tube corrosion.
EPRI's microbiofouling control handbook notes that scale creates surface roughness that accelerates biofilm attachment—making biological fouling more severe in the presence of mineral deposits [6].
Method | Description | Advantages | Limitations |
|---|---|---|---|
Sponge Ball Cleaning | Sponge balls circulated through tubes during operation [1] | Continuous, no outage required, prevents buildup | Less effective on hard scale, balls wear |
Brush Systems | Brushes periodically passed through tubes | Effective on soft deposits, automated | Can scratch tubes, requires reversal mechanisms |
Chemical Cleaning | Acid or chelant circulation [7] | Removes hard scale, reaches all surfaces | Outage required, chemical disposal, corrosion risk |
High-Pressure Water | Hydroblasting at 10,000+ psi | Effective on most deposits, no chemicals | Outage required, labor intensive, tube damage risk |
Mechanical Reaming | Cutting tools through tubes | Removes toughest scale | Slow, tube damage risk, outage required |
EPRI research indicates that approximately 20% of all generating units in the United States employ online mechanical condenser cleaning systems to control fouling and improve cycle efficiency [3].
FEATURED CASE STUDY
Facility: Martin Lake Generating Station
Location: Texas, United States
Application: Condenser tube biofouling control
For many years, condenser biofouling had been difficult to prevent and control at TU Electric's Martin Lake Plant. The plant sought to maintain condenser cleanliness while eliminating the use of chlorine for biofouling control [8].
Innovative online mechanical tube cleaning system installed April 1992
Operated as a tube cleaning service—no capital investment required
System installed while units operating at base load
Chlorine use eliminated for biofouling control
Effectiveness verified by EPRI Plant Monitoring Workstation
"The system was installed while the units were operating at base load. The results of the on-line cleaning effectiveness were determined by the EPRI Plant Monitoring Workstation, installed test grade instrumentation, and on-line video borescope tube inspections."
- TU Electric
Martin Lake Plant [8]
EPRI has developed methodologies to optimize condenser cleaning schedules by balancing cleaning costs against fuel costs from fouling-induced efficiency loss [4].
An optimization program automatically computes a cleaning schedule that minimizes the combined cost of:
Cleaning operations (labor, chemicals, materials, outage costs)
Increased fuel consumption caused by condenser fouling
The fouling measurements from each system are used in the optimization program to determine optimal cleaning frequency [4].
The optimization routine evaluates:
Sensitivity of optimal cleaning schedules to fouling rate
Cost impact ($) of non-optimal cleaning
Accuracy requirements for different monitoring techniques
Lower accuracy is acceptable if the resulting cleaning schedule matches that from higher-accuracy methods [4].
Long Island Lighting Company's Northport Station developed a PC-based program monitoring condenser and sponge ball cleaning system real-time data, providing operators with unit-specific cleaning recommendations to optimize both condenser and cleaning system performance [9].
Beihai Thermal Power Plant — Scale eliminated, heat transfer restored
Facility: Beihai Thermal Power Plant
Location: China
Application: Heat pump station condenser system
The Beihai Thermal Power Plant heat pump station faced significant scale accumulation in their condenser system, reducing heat transfer efficiency and increasing backpressure—directly impacting turbine output and overall plant heat rate [10].
Scale eliminated from condenser tubes
Heat transfer restored to design specifications
Backpressure reduced to optimal levels
Chemical cleaning eliminated
FEATURED CASE STUDY
Facility: Huaneng Power International
Location: China
Application: Power generation condenser system
Huaneng Power International, one of China's largest power generators, struggled with persistent scale formation in condenser systems across multiple units. Scale accumulation forced more frequent offline cleaning, increased maintenance costs, and degraded heat rate [11].
Condenser cleanliness factor maintained above 95%
Online cleaning frequency reduced by 60%
Chemical treatment reduced
Heat rate improvement of approximately 1.8%
"The Vulcan system has maintained our condenser cleanliness consistently, reducing our need for chemical cleaning and improving overall unit heat rate."
- Plant Operations Manager
Huaneng Power International [11]
According to ASME research, generating companies lose hundreds of millions of dollars annually to problems related to condenser and heat exchanger fouling, corrosion, and tube leaks [2].
The EPRI Condenser Tube Failure Control Program disclosed that condenser tube failures contributed to almost 25,000 outages nationwide during a recent four-year period [2]
Tube failures continue to be one of the most pressing issues related to plant output and availability
Effective tube cleaning: Ideally remove all deposits, leaving only the cleanest metal surface [2]
Multi-frequency eddy current testing: Establish overall tube integrity after cleaning
Plugging: Recommended for tubes with poor integrity
Tracer gas leak detection: Sulfur hexafluoride and helium for rapid leak location
By preventing scale formation, Vulcan eliminates the need for aggressive mechanical or chemical cleaning that can damage tube surfaces. Clean tubes mean reliable eddy current testing results and extended tube life.
EPRI's research compared three condenser performance monitoring techniques within the context of optimizing cleaning schedules [4]:
Electromagnetic flowmeter and RTD mounted in a compact waterproof cylinder for continuous, localized measurement.
Plant-wide monitoring using existing instrumentation to track overall condenser performance.
Periodic manual testing following established procedures.
The study found that lower accuracy is acceptable if the resulting cleaning schedule matches that from higher-accuracy methods—but all methods require baseline cleanliness to be effective [4].
Facility: Ultra-High Voltage (UHV) Yinan Power Converter Station
Location: China
Application: Cooling water systems for power conversion equipment
This critical UHV converter station required absolute reliability of cooling systems. Scale formation threatened heat transfer efficiency and could lead to unplanned outages with significant grid stability impacts [12].
Zero scale-related cooling system issues
Reliable heat transfer maintained continuously
No unplanned outages from cooling system fouling
Chemical treatment eliminated
Different plant sizes and cooling configurations require different models. Create an account for detailed specifications and pricing.
SMALL GAS TURBINE
50-100 MW plants
Individual condenser circuits
Heat exchangers
Cooling tower loops
COAL/GAS PLANT
100-500 MW plants
Main condenser systems
Auxiliary cooling systems
Heat rejection loops
LARGE UTILITY
500MW+ / multiple units
Multiple condenser banks
Circulating water systems
Plant-wide scale control
Annual Savings - 500 MW Coal Plant
Fuel savings (2% heat rate improvement @ $3/MMBtu) | $525,000 |
Reduced chemical cleaning costs | $75,000 - $150,000 |
Extended tube life (reduced corrosion/erosion) | $50,000 - $100,000 |
Reduced outage days (1 day @ $500,000/day replacement power) | $500,000 |
Lower maintenance labor | $40,000 - $80,000 |
Total Annual Savings | $1.19M - $1.36M |
With nearly 25,000 condenser-related outages in a four-year period [2], the cost of unplanned downtime far exceeds routine maintenance. One avoided outage pays for plant-wide scale prevention many times over.
For precise pricing tailored to your power plant specifications:
Existing customers: Log in to your account to view model-specific pricing
New users: Create a free account to access detailed pricing and configuration options
Need assistance? Contact our team for a power plant assessment
Account registration takes less than 2 minutes.
Aschoff, A.F. (1987). Performance of mechanical systems for condenser cleaning: Final report. EPRI.
EPRI. (1993). Condenser microbiofouling control handbook. EPRI-TR-102507.
Shields, K. (1995). Choices related to chemical cleaning of fossil plant equipment. EPRI-TR-104502.
Vulcan Descaler. Beihai Thermal Power Plant Heat Pump Station Case Study.
Vulcan Descaler. UHV Yinan Power Converter Station ROI Feedback.
"What is our current condenser cleanliness factor?"
"How does our current heat rate compare to design?"
"What is the dominant fouling mechanism—scale, biofouling, or sediment?"
"Are we cleaning on an optimized schedule based on fouling rate?"
"What is the cost per outage day for our plant?"
"Have we implemented scale prevention to reduce cleaning frequency?"
With Vulcan, you maintain design cleanliness continuously—eliminating the scale that drives frequent cleaning and performance degradation.
Follow EPRI best practices with proven scale prevention technology. Eliminate the root cause of fouling and protect your heat rate.
Waslix (Vulcan Mineral Descaler) provides non-chemical, maintenance-free scale prevention for power generation worldwide. Our technology helps fossil plants maintain condenser cleanliness, optimize heat rate, and reduce tube failures by eliminating scale at its source. Create an account for detailed model specifications and pricing.

Shop with an expert. We're here to help.
Call us: 412-848-5058
sales@vulcandescaler.com
VulcanDescaler.com is owned and managed by Waslix, LLC. Vulcan and its logos are registered trademarks of CWT (Germany).